Expanding to handle projected future flows and pollutant loadings

At a Glance

  • 25K

    Square Feet

  • 34MGD

    Capacity

Location
Layton, Utah
Offices
Partners
  • North Davis Sewer District
Awards
Intermountain Contractor: Best Design-Build Project
Intermountain Contractor: Best Mechanical Engineering/ Construction Project

North Davis Wastewater Treatment Plant Upgrades and Expansion

On this award-winning, design-build project, we increased the average daily wastewater treatment capacity from 25 to 34 MGD with peak flow capacity of 65 MGD, and an allowance to pass a storm flow of 102 MGD. The improvements doubled the daily biochemical oxygen demand and total suspended solids treatment capacity, while providing a better-quality effluent.

We sequenced 10 task orders and supplied a guaranteed maximum price for each one. This phased approach distributed the District’s capital expenditures over a five-year period while considering the plant’s operational and governmental requirements for discharges into the Great Salt Lake.

The facility used solar drying beds to dewater biosolids, which caused periodic seasonal solids backup and contributed to effluent quality problems. Through a series of value engineering workshops, we developed solutions to this challenge and others.

At a Glance

  • 25K

    Square Feet

  • 34MGD

    Capacity

Location
Layton, Utah
Offices
Partners
  • North Davis Sewer District
Awards
Intermountain Contractor: Best Design-Build Project
Intermountain Contractor: Best Mechanical Engineering/ Construction Project

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top