Mid-Breton Sediment Diversion
Historically, sediment-rich water overflowed the banks of the Mississippi River and moved through coastal Louisiana, nourishing healthy wetlands. However, the construction of levees along the lower Mississippi River has since prevented those flows. Resulting subsidence, combined with several other factors, results in the loss of a football field of land every 100 minutes. The purpose of the Mid-Breton Sediment Diversion project is to again divert the sediment-laden Mississippi River waters back into the Breton Sound Basin.
A gated diversion system is being designed to divert approximately 50,000 cubic feet of water per second, or 5 percent of the Mississippi River during high flows, through existing levees to the Breton Sound. A suite of 3D computer models and a physical model are being used to help determine the location of the inlet and the configuration of the corridor through which the diversion system will operate. Water quality modeling is being performed using Delft3D and hydraulic and sediment transport analyses are being performed using HEC-RAS, MIKE21, FLOW-3D, Delft3D and ADCIRC.
This project is considered key to reversing coastal land loss. Upon completion, an estimated 67,500 acres of marsh will be restored, sequestering around 24,000 tons of carbon each year.
At a Glance
-
500
-
50K
-
10
- Location
- Plaquemines Parish, Louisiana
- Offices
-
-
Client
-
Coastal Protection & Restoration Authority (CPRA)
- Location
- Plaquemines Parish, Louisiana
- Offices
- Client
- Coastal Protection & Restoration Authority (CPRA)
Share
Meet Our Team
-
David Hayson
Senior Project Engineer
-
Matthew Hoy
Senior Principal
-
Bret Lavey
Senior Principal, Regional Growth Leader
-
Steve Mathies
Global Practice Leader, Coastal Restoration
-
John Montgomery
Senior Vice President, Director of Water Strategic Growth
-
Austin Nall
Project Manager, Geotechnical Engineering
-
Hilary Thibodeaux
Principal, Senior Project Manager
-
Ryan Waldron
Senior Coastal Engineer
-
Fernando del Monte
Principal, Geotechnical North American Discipline Lead
We’re better together
-
Become a client
Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.