Skip to main content
Start of main content

An innovative “no sludge” solution

At a Glance

  • $25M

    Project Value

  • 10K

    SM Facility

Location
Hastings, New Zealand
Offices
Client
  • Hastings District
Awards
2012 Excellence in Engineering - New Zealand Engineering Excellence Awards
2012 Merit Award - ACENZ INNOVATE New Zealand
White Paper
Learn More

Hastings Wastewater Treatment Plant

Unlike other municipal wastewater treatment plants, which traditionally use primary and secondary treatment incorporating clarifiers, we designed a modified biological trickling filter (BTF) process without primary or secondary clarifiers.

The organic loaded BTF transforms human waste and works to minimize the amount of excess biomass, which is then discharged through a rock-lined channel to a 2.75-kilometre (1.7 miles) long offshore ocean outfall. This eliminates the need for any sludge treatment and subsequent disposal, and is a first for New Zealand. The treatment process also involves fine screening of the waste before pumping into the two 37-metre (approx. 122 feet) diameter BTF structures, where the screened wastewater slowly trickles through a 10 metre (32.8 feet) depth of randomly packed plastic media. Wastewater is transformed into biomass, carbon dioxide and water, and meets Maori requirements for treatment of human waste.

This unique $30 million Hastings wastewater treatment plant has proven itself to be leading edge, technically robust, cost-effective and culturally acceptable. By separating the industrial wastewater flows from the domestic flows and developing the treatment solution in partnership with Maori, we created an innovative solution that has resulted in a paradigm shift in wastewater planning and treatment.

Article
Working "shoulder-to-shoulder" with local Māori for a culturally-sound wastewater solution

At a Glance

  • $25M

    Project Value

  • 10K

    SM Facility

Location
Hastings, New Zealand
Offices
Client
  • Hastings District
Awards
2012 Excellence in Engineering - New Zealand Engineering Excellence Awards
2012 Merit Award - ACENZ INNOVATE New Zealand
White Paper
Learn More

Meet Our Team

Paula Hunter, National Planning Specialist

I am committed to planning excellence and the delivery of best practice solutions.

Jim Bradley, Technical Director, Environmental & Public Health

I'm dedicated to my clients, iwi, and stakeholder groups to navigate challenging projects that provide sustainable and valued outcomes.
Jim Bradley Technical Director, Environmental & Public Health Read More

Grant Russell, Planning Growth Leader

By fostering authentic and meaningful collaboration with my team and clients, I aim to find viable solutions to complex situations.

Paula Hunter

National Planning Specialist

Jim Bradley

Technical Director, Environmental & Public Health

Grant Russell

Planning Growth Leader

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top