Skip to main content
Start of main content

Developing options for enhancing hydropower capacity in a legacy facility

At a Glance

  • 1914

    Year Commissioned

  • 39

    Megawatts

  • 65m³

    Discharge/Second

Location
Lake Coleridge, New Zealand
Offices
Client
  • Manawa Energy
Partners
  • Riley Consultants
  • Peter Lilley

Lake Coleridge Power Station

The Lake Coleridge hydropower facility on the Rakaia River is one of the oldest major infrastructure projects in New Zealand. As demand for power has grown, Lake Coleridge has upgraded capacity in response. The scheme now comprises the Wilberforce and Harper River diversions, storage of 150 million cubic metres of water, and a powerhouse with 39 megawatts installed capacity. Currently operating at 85 percent maximum generating capacity, the facility plays a critical role providing consistent power supplies alongside wind and solar.

With an eye to creating greater and more consistent output, the facility’s operator, Manawa Energy, engaged us to lead a collaborative pre-feasibility study with Manawa, Riley Consultants, and Peter Lilley. Our job? To consider enhancement opportunities around the existing Coleridge hydro-electric scheme. Key to developing options was the utilization of an additional 25 cubic metres per second peak discharge, bringing the potential maximum power station discharge up to 65 cubic metres per second.

Our recommended options included constructing a new waterway conveyance for power generation, increasing waterway discharge by constructing a new surge chamber, a “pumped-over” new waterway option to take advantage of time-of-day price differentials, and a fourth option—a new intake, surge chamber, penstock, and powerhouse, as well as underpinning, lowering, and uprating intake tunnel one. 

As New Zealand moves to ever more power from renewables, the Lake Coleridge hydropower scheme shows how a legacy facility can still play an important role more than 100 years on from its commissioning.

At a Glance

  • 1914

    Year Commissioned

  • 39

    Megawatts

  • 65m³

    Discharge/Second

Location
Lake Coleridge, New Zealand
Offices
Client
  • Manawa Energy
Partners
  • Riley Consultants
  • Peter Lilley

Meet Our Team

Tom Kirk, Principal Hydro Mechanical Engineer

We will continue to advance the hydropower industry by truly understanding our clients’ needs while performing expanded, value-added services.

Robin Spittle , Hydropower Consultant

I haven’t stopped learning since I started working as a consultant. Every project provides a unique challenge and new lesson.

Tom Kirk

Principal Hydro Mechanical Engineer

Robin Spittle

Hydropower Consultant

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top