Tucson International Airport - Main Terminal Apron Reconstruction
Tucson International Airport’s Main Terminal Apron exceeded its life expectancy—when it passed the point of effective maintenance, it was time for it to be replaced.
Our local Airport team embarked on Tucson Airport Authority’s (TAA) largest construction manager at risk (CMAR) project to date, allowing them significant cost and time savings. The project included removing the existing 12-inch Portland cement concrete pavement (PCCP) and replacing it with approximately 130,000 square-yards (108,697 square-metres) of new 16-inch PCCP. It was critical that we worked closely with TAA and the CMAR to incorporate their perspectives during design. This allowed the team to efficiently deal with limited closure areas and issues in a cost-effective manner, as well as coordinate Federal Aviation Administration Airport Improvement Program grant funding with construction sequencing. With 23 separate construction phases, the team took no more than two gates on each concourse out of service at any given time.
The project also featured a new apron storm drainage system, as well as upgraded apron lighting, a 400 hertz power system, hydrant fueling system, and a fuel truck loading stand. As a result of our work—and close coordination—we were able to create a phasing and funding plan that reduced overall construction from five years to just over two.
At a Glance
-
$35M
Construction Value
-
130K+
SY of PCCP
-
23
Construction Phases
- Location
- Tucson, Arizona
- Offices
-
-
Client
-
-
Tucson Airport Authority
-
-
Partners
-
-
Granite Construction Co.
-
- Location
- Tucson, Arizona
- Offices
- Client
-
- Tucson Airport Authority
- Partners
-
- Granite Construction Co.
Share
Rich Zych, Senior Associate, Transportation
Whether designing a runway or leading a construction administration team for an apron expansion, collaboration with the airport from start to finish is key.
Mark Koester, US West Airport Infrastructure Lead
You won’t even know we’re there. When travelers aren't affected by the work we’re doing at an airport—that’s what I consider a success.
Mike Smejkal, Principal, US Mountain Region Airport Infrastructure Lead
Our goal is to listen to all our clients stakeholders and then direct our passion and energy on the solutions.
Jim Wright, Project Manager, Transportation
Working on a dynamic portfolio of local transportation projects keeps me deeply connected to my community.
We’re better together
-
Become a client
Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.