Meeting the energy needs of approximately 20,000 homes
Indaver has successfully developed a 220,000tpa waste management facility which has been operational since December 2012 and generates 17MWe. The plant consists of a waste reception bunker, an incineration furnace with recovery boiler producing superheated steam, a flue gas cleaning plant and a power island. The steam is used for electricity production through a turbo-generator system.
After the successful delivery of process design services during 2009, Stantec were responsible for providing EPC-M services including 3D layout integration for all process facilities. During the commissioning stage this included technical project management, design integration and detail design of the steam condensate cycle and balance of plant.
Stantec was selected as the winner of the ‘special recognition award’ in the category ‘sustaining our environment’ at the annual ‘Be Inspired Through Leadership Infrastructure’ event, which took place in Amsterdam in 2010. The independent judges panel stated that Stantec received the award because of the way it integrated the designs of several suppliers into its own design and for its innovative use of Bentley Design Software.
At a Glance
- Offices
- Client
-
- Indaver
- Awards
- Special Recognition Award – ‘Be Inspired Through Leadership Infrastructure’ Event 2010
We’re better together
-
Become a client
Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.