Skip to main content
Start of main content

Published in APWA Reporter: Water Resources Design for Long-Term Operations & Maintenance

September 25, 2019

Current View
of

By Dan Grandal, Rob Mullins, Jr. and John Take

Public Works officials are facing numerous unprecedented infrastructure challenges — each offering a different operations and management hurdle

Aging infrastructure, escalating maintenance costs, rapidly changing technology, and advanced training for the workforce are just a few of the infrastructure challenges public works officials have to deal with and solve these days. So what is the best plan of attack?

Using the Hurricane and Storm Risk Reduction System’s Permanent Canal Closures and Pumps (PCCP) project as a guide, this article from John TakeRob Mullins Jr., and Dan Grandal in the September issue of APWA Reporter looks at how anticipating and planning adaptability and resiliency into the design of a project at the beginning is the key. 

  • Dan Grandal

    Dan has been helping communities build their infrastructure for over 20 years.

    Contact Dan
  • Rob Mullins, Jr.

    Rob came to Stantec after 30 years in the federal government and private sector.

    Contact Rob
  • John Take

    As executive vice president and chief growth and innovation officer, John oversees the activities of Stantec’s five business operating units with a focus on strategic growth initiatives and campaigns.

    Contact John
End of main content
To top