Skip to main content
Start of main content

A milestone for the Anadromous Fish Screen Program, this replaces one of the last unscreened diversions on the Sacramento River

At a Glance

  • 15

    Year Project Commitment

  • 15K

    Acres Irrigated

  • $48M

    Construction Value

Location
Yolo County, California
Offices
Awards
2017 Outstanding Water/Wastewater Treatment Project of the Year — Sacramento Section of the ASCE
2018 Clair A. Hill Agency Award for Excellence, Finalist, Association of California Water Agencies

Sacramento River Joint Intake and Fish Screen

Farmers in the Sacramento Valley irrigated their crops with water supplied by Reclamation District (RD) 2035’s 97-year-old pump station. With no fish screens, diversion pumping endangered the migrating Chinook Salmon, Steelhead Trout, and other Anadromous species. Plus, people in Woodland and Davis relied on drinking water supplied by groundwater with water quality issues. The Woodland-Davis Clean Water Agency (WDCWA) needed a high-quality, more-reliable water supply solution. 

These agencies joined forces to build the new $58 million Joint Intake and Fish Screen project. Completed in 2017, it diverts water from the Sacramento River at up to 400-cubic feet/second (cfs), enough to fill an Olympic-sized pool in four minutes. The high-profile, stainless steel, flat-plate fish screen system was specifically designed with 1.75 millimetre slot openings and cleaning systems to protect native species without impacting the river’s natural flow. 

Overall, we spent more than 15-years collaborating with RD 2035, WDCWA, and other stakeholders to develop alternatives, secure grant funding, obtain project approvals, and construct the project. The result? 15,000 acres of reliable irrigation water to eastern Yolo County and 30 million gallons of surface water delivered daily to the cities of Woodland and Davis. 

At a Glance

  • 15

    Year Project Commitment

  • 15K

    Acres Irrigated

  • $48M

    Construction Value

Location
Yolo County, California
Offices
Awards
2017 Outstanding Water/Wastewater Treatment Project of the Year — Sacramento Section of the ASCE
2018 Clair A. Hill Agency Award for Excellence, Finalist, Association of California Water Agencies

Meet Our Team

Janet Atkinson, Vice President, Chief Civil Conveyance Engineer, Water

In California, transporting water to cities and farms is an economic imperative. By advancing fish screen design, I help keep water moving.
Janet Atkinson Vice President, Chief Civil Conveyance Engineer, Water Read More

Justin D. Bartels, Principal, Hydraulic Engineer

Treating water with respect will help is build a better, more sustainable future.

Janet Atkinson

Vice President, Chief Civil Conveyance Engineer, Water

Justin D. Bartels

Principal, Hydraulic Engineer

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top