Keeping the lights on in Newington with this award-winning power plant

Location
Newington, Connecticut
Offices

Newington Power Plant

Fueling the activities of daily life, every power plant in the world has an impact on the community they exist in. That’s why, when it came time to build the Newington Power Plant, we made sure that impact was a positive one.

For this project, our initial design effort required a detailed accounting of all control and protection functions, some of which required relocation, and others that would be duplicated on the new breaker. In the end, we installed a purpose-built 18-kilovolt generator breaker in the bus between the generator and the generator step-up at this 525-megawatt combined cycle power plant.

Recognized as the “Best of the Best” in 2013 by the Combined Cycle Journal, this power plant will continue to keep the lights on in Newington for years to come. 

Location
Newington, Connecticut
Offices

Meet Our Team

Steve Patry, Senior Associate, Structural Engineering Manager, Power (US East)

The most rewarding aspect of my career is working with our team of engineers and designers to develop solutions to challenging problems that benefit our clients and communities.
Steve Patry Senior Associate, Structural Engineering Manager, Power (US East) Read More

Steve Patry

Senior Associate, Structural Engineering Manager, Power (US East)

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top