LeTourneau Road Emergency Repair Project

In the wake of the Mississippi River flooding in 2008, LeTourneau Road suffered massive damage that nearly rendered the only access to the road to LeTourneau impassable. The flood had damaged approximately 6,100 feet of roadway, and the shoulder and half of the westbound lane had been lost. The emergency portion of our project re-established the roadway’s eastbound lane.

Two additional projects followed this emergency repair. The second project was funded by the Emergency Watershed Program. An additional 10 feet of shoulder on the downstream side of the road (eastbound lane) was constructed. The roadway embankment slope was stabilized with rip-rap to prevent damage during future flood events. The third project consisted of paving the re-constructed eastbound lane and the newly constructed 10 foot shoulder.

At a Glance

  • 6100'

    Road Lost to Floods

  • 10'

    Of Add. Shoulder

Location
Vicksburg, Mississippi
Offices

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top