Improving traffic efficiency and vehicle safety while helping to beautify the Town of Cutler Bay

At a Glance

  • $10M+

    Project Value

Location
Town of Cutler Bay, Florida
Offices
Client
  • Town of Cutler Bay, FL
Award
APWA Florida Chapter 2015 Consultant of the Year (Roads and Highways)

Caribbean Boulevard Roadway Improvements and Traffic Study

Located on the southeast coast of Florida, the Town of Cutler Bay is home to over 40,000 people. We had previously helped the Town improve its beloved Old Cutler Road. So, when they wanted to enhance Caribbean Boulevard between Southwest (SW) 106 Court to SW 184th Street, they came to our Community Development team for assistance.

As the prime consultant for this project, we provided drainage analysis and stormwater design, traffic engineering, Americans with Disabilities Act (ADA) ramp design and installation, and other related services. From our drainage analysis, we determined that the corridor had insufficient stormwater and green infrastructure. This meant that there were no curbs and gutters, limited landscaping, unpaved, relatively flat profile grading, and inadequate drainage systems. We developed a plan to address these issues as well environmental concerns raised by Miami-Dade County.

Since Caribbean Boulevard is primarily a residential road, the Town wanted to implement traffic calming and other safety measures. We designed roundabouts, landscape medians, and traffic calming splitter islands where plausible. Additionally, we conducted a traffic operational and capacity analysis study for the corridor, which included traffic data collection and field inventory of existing conditions, evaluation of existing signal operations and timings, and development of optimal signal timing parameters. We also provided engineering design services for the second phase of improvements between SW 87th Avenue to SW 184th Street, which are currently under design and slated for construction by the end of 2025.

As the improvements finish, travelers along Caribbean Boulevard will enjoy increasingly safer passage as they head home or to destinations beyond.

At a Glance

  • $10M+

    Project Value

Location
Town of Cutler Bay, Florida
Offices
Client
  • Town of Cutler Bay, FL
Award
APWA Florida Chapter 2015 Consultant of the Year (Roads and Highways)

Meet Our Team

Carlos Herdocia, Project Manager

No matter the infrastructure challenge, we can help you overcome it.

Ramon Castella, Vice President, Water

I appreciate working on projects that make a difference in the community and create a lasting impression. It makes the day to day worth it.

Carlos Herdocia

Project Manager

Ramon Castella

Vice President, Water

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top