Keeping communities powered

At a Glance

  • 101

    Lineal KM

  • 292

    Transmission Towers

Location
Pike and Ipiatik Lake, Alberta
Offices

Pike and Ipiatik Lake Substations and Transmission Line

We provided geotechnical recommendations for the proposed 100-kilometre 240kV transmission line in Northern Alberta. The work involved over 290 tower structures and two substations. Our site investigation equipped the utility with necessary subsurface and groundwater details to design foundations for the tower structures.

To optimize foundation design specific to subsurface soil conditions, we drilled boreholes and conducted cone penetration testing (CPT) at numerous proposed transmission tower locations to characterize site conditions. Soil characteristics were confirmed through downhole and laboratory testing, in addition to the CPT results.

Completing an investigation of this size requires careful planning to efficiently line up people and resources. Throughout the project we interfaced with geotechnical drilling rigs, other utilities, and pipeline representatives to bring in required equipment and gain necessary clearances. Additional coordination with tree fallers was required for the substation areas.

Our recommendations incorporated the requirement for large lateral loads and the presence of muskeg, a wet, acidic soil found in northern climates. 

At a Glance

  • 101

    Lineal KM

  • 292

    Transmission Towers

Location
Pike and Ipiatik Lake, Alberta
Offices

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top