Skip to main content
Start of main content
Current View
of

By Erez Allouche

This article from Trenchless Technology, co-authored by Stantec, looks at a trenchless rehab project on a 110-year-old sewer system in Toronto, Canada

Toronto Water recently began the third phase of a project to rehabilitate its High-Level Interceptor, one of three interceptors serving the city, near the city’s downtown area. Updates to the 110-year-old brick sewer centered around a trenchless approach, with Stantec leading design for Phase III of the project. A collaborative team approach made it possible to develop innovative solutions, despite construction challenges, for successful completion.

  • Erez Allouche

    A published expert in trenchless design and horizontal directional drilling, Erez has spent two decades researching and practicing on the cutting edge of underground infrastructure.

    Contact Erez
End of main content
To top