- Location
- Pittsfield Charter Township, Michigan
- Offices
-
- Location
- Pittsfield Charter Township, Michigan
- Offices
Share
Platt Road Greenway
Pittsfield Charter township was looking to connect residential developments with recreational and open spaces within the community. The solution? A shared-use path.
For this project, we provided engineering, design, bidding assistance, and construction services to install a two mile long shared use path along Platt Road between Ellsworth Road and US-12. It was contracted as a Michigan Department of Transportation local service project, and was constructed using surface transportation program enhancements and high priority project funding from the Federal Highway Administration. Our design included a 14-foot-wide flexible pavement hot mix asphalt surface, 2-foot clear zone, storm water improvements, wetland mitigation, prefabricated pedestrian bridge over the Koch Warner Drain, signing, stripping, landscape improvements and restoration.
Eventually, as more sections were completed, the Platt Road Greenway became a part of a much larger network of trails that enabled township residents to enjoy safe, non-motorized travel throughout their community, neighboring communities and beyond.
- Location
- Pittsfield Charter Township, Michigan
- Offices
-
- Location
- Pittsfield Charter Township, Michigan
- Offices
Share
We’re better together
-
Become a client
Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.