Skip to main content
Start of main content

Homes and businesses protected by reconstructed levee

At a Glance

  • 300FT

    Streambank

Location
Elba, Minnesota
Offices

Levee Rehabilitation and Roadway Raising and Drainage Projects

Notorious for flooding, the Whitewater River overtopped the existing levee in 2007 and caused severe damage to Elba, Minnesota. Taking preventive measures to ensure the safety of Elba, we diverted stormwater flows around the city’s levee system, and designed a ponding system and stormwater lift station to pump stormwater runoff generated within the levee system.

We also stabilized 300 foot segment of the Whitewater River streambank and a 30 foot high by 800 foot long roadway embankment overlooking the river. Stantec included water quality treatment of diverted stormwater flows using a stormwater quality structure in combination with an infiltration trench, sluice gates within culverts crossing under the levee, geogrid reinforced soil roadway embankments, and stormwater interception trenches along the base of area bluffs. 

At a Glance

  • 300FT

    Streambank

Location
Elba, Minnesota
Offices

Services


Markets


Meet Our Team

Joe Palen, Senior Associate, Community Development

We strive to provide exceptional customer service to our clients by providing trusted advice and creative, cost effective solutions.

Joe Palen

Senior Associate, Community Development

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top